Presentation
Accurate Data Transfer for Telescopes and Amusement Rides
Accurate data transfer during Design-Build projects can make or break your project. Find out what Dynamic Structures has done that works.
Some of the most costly errors that can occur in a Design-Build environment arise because of inadequate transfer of requirements from concept through to production and installation. The methodology utilized by Dynamic Structures will be presented with real life examples from their portfolio of international amusement rides, telescope observatory, and optics projects. Future improvements to their current system will also be presented.
Presenter
Craig Breckenridge
Lead Designer
Dynamic Structures
Craig Breckenridge has 40 years experience in the Design-Build arena having worked on everything from bridges and architecturally driven structures to complex machines. He is currently the Lead Designer for the Thirty Meter Telescope Project at Dynamic Structures where he has also held the positions of DO Manager and Engineering Systems Manager. Over the years, he has been instrumental in helping design and manufacture several observatories and many amusement rides.
3D Collaboration & Interoperability Congress
The 3D Collaboration & Interoperability Congress (3D CIC) focuses on 3D CAD collaboration and interoperability for the entire product lifecycle. The 2018 theme of Enterprise Accountability will bring together real users to share experiences and learn about the topics of Culture & Champions, Quality, and Manufacturing. 3D CIC 2018 will be held October 15-18, 2018 at the American Mountaineering Center in Golden, Colorado. Find out more and register at 3dcic.com.